Estimate bricks, concrete, plaster, paint and tiles in seconds — using the same volume-based formulas our own engineers use for material planning.
Fill in your measurements, hit calculate, and get an instant material estimate. Every field is validated as you go, so you'll never see a broken or impossible result.
Estimate how many bricks and how much mortar (cement & sand) your wall needs.
Based on the standard Pakistani brick size and mortar-joint volume method.
Formula: Bricks = Wall Volume ÷ (Brick + Mortar Joint Volume). Mortar mix assumed 1:6 (cement:sand) with a 33% dry-volume allowance and 1.25 cft per 50kg cement bag.
Estimate cement, sand and aggregate for a concrete slab, footing or column.
Dry-volume method — the industry-standard way to size concrete pours.
Formula: Dry Volume = Wet Volume × 1.54 (accounts for voids and shrinkage after mixing). Material quantities split by ratio, cement converted at 1.25 cft = one 50kg bag.
Estimate cement and sand for wall plastering, internal or external.
Includes the standard 33% dry-volume (bulking) allowance for cement-sand plaster.
Formula: Dry Volume = (Area × Thickness) × 1.33. Material split by cement:sand ratio, cement converted at 1.25 cft = one 50kg bag.
Estimate how many litres of paint your walls will need.
Coverage varies by paint brand and wall texture — adjust the coverage field to match your tin's label.
Formula: Litres = (Net Area × Coats) ÷ Coverage per Litre, plus wastage allowance. Suggested packs are calculated from common 20L / 4L / 1L tin sizes.
Estimate how many floor or wall tiles you'll need to order.
Wastage allowance is higher for tiles to cover cutting and breakage.
Formula: Tiles = Room Area ÷ Tile Area, rounded up after applying the wastage allowance.
Our engineers will walk your plot and hand you a firm, itemized BOQ — free of cost.